Home
Products
Solutions
About Us
Through-Wall Pipelines
Quick all-in-one solution for through-wall pipelines
Through-Wall Pipelines
Challenges
Space
Unreachable hidden space with possible quietly moisture condensation
Substrate
Difficult to reach high surface preperation (e.g. ≥St3)
Labor
Require skilled technicians
Proposals

Structure:

Ancorro VE SelFusion + Fireproof Mastic / Foamed PU

Benefits:

Tolerant Preparation:

  Min. St2 by hand tools


Easy Application:

  No primer, one step cold wrapped by hand


Weather Resistance:

  Over 20 years service life


01

Prepare surface to minimum St2

02

Wrap Ancorro VE SelFusion

03

Seal both end with Fireproof Mastic / Foamed PU

04

Overall inspection

500+
Served over 500 urban gas customers

Apply Time2Minutes

Apply Crew1Persons

Increase your pipeline assets sustainable

-30-70

Service Temperature Rang

+20Years

Over 20 year service life

+1000000Meters

Over 1,000,000 meter apply records